We had known that Disney was converting the old Maelstrom boat ride to a Frozen-themed attraction, and that a meet-and-greet would be part of the new overlay for the Norway pavilion, but today's filing confirms that the meet-and-greet will happen in a new building, rather than taking over some existing space in the pavilion.
From Disney's description of the project in the application: "The project includes the following: construction of a 13,000 +/- sf building that will house a Disney guest attraction and a women's restroom; construction of a 2,000 sf modular type building to replace a similar building demolished for the project; construction of two small parking lots that have a total of 18 parking spaces; relocation of piping and mechanical equipment associated with a beverage dispensing kiosk; modification and addition of sidewalks and planters; new underground utilities; modification to the existing restroom in the Norway attraction building."
And here is the site plan:
The new Frozen ride is scheduled to open in 2016.
This article originally appeared at http://ift.tt/1DEKPSg. All rights reserved. If you are not reading this on a personal RSS reader (such as Feedburner) or on http://ift.tt/N0yOgi, you are reading a scraper website that has illegally copied and stolen http://ift.tt/N0yOgi's content. Please visit http://ift.tt/1DEKPSg for the original version, along with all its comments.
from Theme Park Insider http://ift.tt/1u4MXtV
Aucun commentaire:
Enregistrer un commentaire